Description
A luxury residential villa with a modern, sustainable character, built from recycled and combined 6 containers across two floors (ground and first). It features an advanced engineered continuous-assembly system completed entirely within 48 hours without conventional welding, integrating all essential spaces (bedrooms, reception, and office) with refined finishes suited to modern rapid-construction standards.
Scope of Work
First: Engineering and construction works
- Supply and preparation of 6 containers meeting standard specifications (20 or 40 feet).
- Cutting works, steel base framing, and thermal and waterproof insulation of containers.
- On-site assembly and joining engineering using rapid mechanical fastening systems within 48 hours.
Second: Architectural partitioning and layout
- Ground floor: design and execution of the reception and seating area, home office, service kitchen, and guest bathroom.
- First floor: design and execution of bedrooms (including the master bedroom with private bathroom), additional bathrooms, and circulation areas.
Third: Fitting and interior finishes
- Electrical installations and outlets for lighting and air conditioning.
- Plumbing works and internal water and sewage network connections.
- Final finishes for ceilings, walls, and floors preserving the modern character and full comfort.



